Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jun 25, 2021     Cowling hinge pins and MTH gear - (2 hours) Category: Engine
Drilled second hole in fire wall for the right side cowl pin. Goes in about as well as the left side which is almost impossible. Screws in with a drill attached, but need to make it easier to install. Determined I have the wrong gear for the MTH need a direct drive gear so will try and order that next week. Dropped the oil cooler and put a dent in the back side. @#$&* Don't think it is damaged, but will try and test for leaks on the bench. Removed the cowls and top forward skin to begin oil cooler mounting and prep for wiring. Not a real productive day.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.